Gerüstbau Müller GmbH

Stair Tower in Cologne and Bonn

Construction stair tower · Escape stair tower · Approval

As specialists in stair towers in Cologne, Bonn and the wider region, Gerüstbau Müller plans standard-compliant stair towers for safe scaffold access and as escape stair towers – erected and approved in accordance with TRBS 2121-1 and DIN 18065. A specialist contractor with over 90 years of experience.

90+Years of experience
2.000+Projects per year
250.000 m²Own scaffolding equipment
2 min.to your guide price
Please note

The most important rule change your contractor needs to know

Since the revision of TRBS 2121-1 in 2019, access via internal ladder bays is only permitted up to a climbing height of 5.00 m. Previously the limit was 10.00 m – anyone still planning with the old figures is planning incorrectly.

from 10.00 mTRBS 2121-1 old – no longer applies
from 5.00 mTRBS 2121-1 new – in force since 2019
up to 7.00 mException for detached houses

And the point that most often causes discussion on the invoice: under § 4.2.11 DIN 18451, a stair tower is always a special service. It must be expressly agreed in the specification of works and is never automatically included in the scaffolding price. Gerüstbau Müller clarifies this with you openly from the outset – so there are no surprises later.

Basics

What is a stair tower?

A stair tower is a modular staircase made from system-tested scaffolding components, erected either as a free-standing structure or as an extension to an existing scaffold.

It performs two fundamentally different tasks. As a construction stair tower, it provides ergonomic, safe access to scaffold and working levels on site. As an escape stair tower, it provides a standard-compliant second escape route for buildings – approved by the building authority and the fire brigade.

Unlike a ladder bay, a stair tower can be climbed comfortably even in protective equipment or while carrying tools or materials – and it keeps traffic off the working platforms on the scaffold. We supply it to go with facade scaffolding, roof safety scaffolding and PV scaffolding.

Stair tower built from scaffolding components as safe access to the scaffold – Gerüstbau Müller Cologne Bonn
Use

When is a stair tower mandatory?

From a climbing height of 5.00 m, a stair tower or an equivalent safe means of access is mandatory – lifts and stairs take precedence over ladders. These are the four cases we see most often in Cologne and Bonn.

Construction stair tower – safe scaffold access

On sites with scaffold heights above 5.00 m, the stair tower is the standard-compliant means of access. It is erected as an additional bay in front of the scaffold, so the working platforms on every lift remain clear – no through traffic disrupts the work. Gerüstbau Müller supplies and erects stair towers in various width classes.

Escape stair tower – second escape route

An escape stair tower is required when an existing escape route is blocked by building work, the routes to the internal emergency staircase become too long, a change of building use requires additional escape routes, or the authorities demand more escape routes for events and refurbishments. The stair layout complies with DIN 18065 and the load capacity is at least 5.0 kN/m² – so fire brigade operations with stretchers and equipment are also safely possible.

Temporary access stairs during conversion and refurbishment

During refurbishments, school conversions or work on public buildings, the internal staircase is often closed temporarily. A stair tower from Gerüstbau Müller provides a safe, standard-compliant alternative at short notice – for users, tradespeople and visitors.

Stair towers for events

For large events, concerts or sporting events, the public order office and the fire brigade often require additional escape routes. Gerüstbau Müller erects standard-compliant stair towers at short notice and dismantles them quickly after the event – without disrupting ongoing operations.

Approval

Escape stair tower: who approves it?

Before it is used as an escape route, the tower is approved by the responsible building authority and the local fire brigade. Only then may it be used as an escape or rescue route. Gerüstbau Müller coordinates this process in full.

1

Advice

We establish which type of stair tower complies with the standards for your purpose – site access or escape route.

2

Planning

Erection planning in accordance with TRBS 2121-1 and DIN 18065, tailored to the building, the site and the escape route layout.

3

Erection

Erection by our own trained crews using system-tested components, with an inspection report.

4

Official approval

For escape stair towers, we coordinate approval by the building authority and the fire brigade, including documentation.

Scope of services

Our scope of services for stair towers

Gerüstbau Müller is your partner for stair towers in Cologne, Bonn and the Rhein-Sieg district and handles the entire process – from advice to official approval.

  • Advice on which type of stair tower complies with the standards for your purpose
  • Erection planning in accordance with TRBS 2121-1 and DIN 18065
  • Delivery from 250,000 m² of our own equipment
  • Erection by our own trained scaffolders
  • Inspection by a competent person, including an inspection report
  • For escape stair towers: coordination of approval by the building authority and the fire brigade
  • Provision at short notice if an escape route becomes unavailable unexpectedly

As a member of the German Scaffolding Guild, we work exclusively with approved system scaffolding from leading manufacturers – we use Layher Allround and Rux Super. You will find an overview of all scaffolding types and applications on our services page.

Stair tower erected by Gerüstbau Müller as standard-compliant access on a construction site
On video

Stair tower in use

A quick look at an erected stair tower – and at why a ladder bay is no longer sufficient from 5.00 m.

Service area

Where we erect stair towers

Our yard is in Niederkassel, right between Cologne and Bonn. From there, our crews reach sites across the region quickly – which matters most when an escape route has to be replaced at short notice.

Need access or an escape route at short notice? Call us on +49 2208 4025 – Mon to Thu 7:00 am to 4:00 pm, Fri until 1:00 pm.

Questions

Frequently asked questions about stair towers

From what scaffold height is a stair tower mandatory?

Since the revision of TRBS 2121-1 in 2019, a stair tower or equivalent safe means of access has been mandatory from a scaffold height of 5.00 m. For detached houses there is an exception up to a building height of 7.00 m. Previously the limit was 10.00 m.

How much does a stair tower cost in Cologne or Bonn?

The cost depends on the required height, the rental period and the purpose – that is, whether the tower serves as site access or as an escape route. After a short site visit, Gerüstbau Müller prepares a binding quote (lump sum or by measurement, depending on the building), transparent and with no hidden costs. The quickest way to a guide price is our online scaffolding calculator – in about 2 minutes, free and non-binding.

Who is allowed to approve an escape stair tower?

An escape stair tower used as an escape route must be approved by the responsible building authority and the local fire brigade. Only after this approval may it be used as an escape or rescue route. Gerüstbau Müller coordinates this process in full.

What is the difference between a construction stair tower and an escape stair tower?

The construction stair tower provides scaffold access on site and is subject to the requirements of TRBS 2121-1. The escape stair tower serves as an escape route and must additionally comply with DIN 18065, have a load capacity of 5.0 kN/m² and be officially approved.

Can a stair tower be supplied at short notice?

Yes – Gerüstbau Müller also provides stair towers at short notice, for example when an escape route is blocked by building work. Call us directly: +49 2208 4025.

Is a stair tower always included in the scaffolding price?

No – under § 4.2.11 DIN 18451, a stair tower is always a special service that must be agreed separately. Gerüstbau Müller points this out to you proactively so there are no surprises.

Gerüstbau Müller

Need a stair tower?We’ll put it up.

Whether safe scaffold access, an escape stair tower or a temporary access solution during refurbishment: Gerüstbau Müller plans and erects stair towers in compliance with the standards – from advice to official approval. Over 90 years of experience in the Cologne/Bonn region.

Scroll to Top